Skip to main contentMAGNUS REACTOR

Every file where the next person looks for it

Photos, documents and evidence attached to the tag, the installed unit, the work order and the test record

Files on records, not in folders

A photo saved on a phone, a datasheet in a shared drive and a test report in someone's inbox are three files nobody finds when the pump trips at two in the morning. Magnus Reactor attaches each file to the record it describes, whether tag, installed unit, work order, failure event or test record, so it stays with the equipment and the job.

Because the register keeps the tag and the serial as separate records, a file lands at the right level. Vendor drawings follow the unit through a change-out; the isolation sketch stays with the tag; the completion photo stays with the work order that produced it. Nobody rebuilds a folder tree to mirror the plant, because the nine-level taxonomy is the folder tree.

See Work Orders

Benefits

  • Capture the fault as it looked

    Photograph the leak, the gauge reading or the damaged impeller and attach it to the failure event or work order from the field. The picture arrives with the tag, the time and the reporter already set.

  • Open the manual from the tag

    Datasheets, drawings and vendor manuals sit on the equipment record, so a technician standing at KIK-8121-A opens the right document without knowing which folder someone filed it in three years ago.

  • Prove the work was done

    Completion photos, test reports and witness evidence stay with the work order or test record they support, ready when the technical authority reviews closure or an auditor asks for the evidence.

Attach files at the level they belong

  • Photograph the job as it happens

    Take a picture at the tag and it lands on the work order or failure event you are reporting against, before the codes and before the write-up. The planner completes mechanism and cause with the picture in front of them.

  • Keep documents on the equipment

    Attach datasheets, P&IDs, vendor drawings and manuals to the functional location or the installed unit. Documents about the function stay with the tag; documents about the hardware stay with the serial and follow it through every change-out.

  • Attach evidence to the test record

    A proof test records the criterion, the acceptance limit and the result; the calibration report and witness photo attach to that test record. When the test fails, the failure event it opens carries that evidence with it, so the person coding the failure sees what the tester saw.

Take the next step

Walk through Magnus Reactor with someone who has run maintenance operations — on your own asset data, at your pace.